Skip to main content

The Carriages at Cedar Rock

Webster, NY

Project Summary

Starting with a “typical” set of architectural plans the Douglas Electric team laid out all electrical and fire alarm devices per the NEC. Once this was done the team worked with the owners, general contractor, and architectural design team to select fixtures that would fit both the project design parameters and budget parameters to ensure a successful product. The Douglas Electric team managed all electrical permits and paid all fees to make sure that this process was seamless and transparent.

Related Projects

Designed and developed by