Project Summary
This expansion at St James hospital in Hornell NY includes nine exam rooms, four offices, a new nurse station and waiting room, POC Lab, break room, two restrooms, secured medicine room, clean and soiled rooms, and a height/weight area.
Douglas Electric installed a new 200 amp 480 volt three phase panel from an existing main distribution panel, a 75kva transformer, and 200amp three phase 120/208volt panel.
All branch circuits were wired to NEC standards using EMT piping and insulated grounding conductor, along with HCF MC cable (health care facility grade).